Monthly Archives: September 2016

  • Flap Indicator

    Posted on 18. September 2016 by Thomas in Instrument Panel, Recent Posts.

    The inspector advised to install an flap indicator. With the standard setup it was not possible to make appropriate markings. An aluminim strip above the installation makes it possible to mark the flap positions. The Rebel standard positions are in increments of 6 degrees. For the sake of simplicity I marked the positions in 10 […]

    Continue Reading...
    Comments Off on Flap Indicator
  • Wing Fairings

    Posted on 18. September 2016 by Thomas in Recent Posts, Wings.

    Fabricating the wing fairings was a time consuming job. Lots of checking and reshaping. Due to the ballistic recovery system harness at the front wing connection it has to be a little big thicker at the front.

    Continue Reading...
    Comments Off on Wing Fairings